MPC Vessel

Type of Ship: MPC Vessel Customer: Grona Shipping GmbH, Germany. Units: 08 Grona Projects.  EMS RIVER  IMO 9551662 928/01  MPC Vessel L.O: 99.53m B.M: 13.35m  Depth: 9.10m Draught: 6.15m D.W.T: 5200 01.12.2010 Grona Shipping GmbH, Germany. EMS SEA  IMO 9552020 928/02  MPC Vessel L.O: 99.53m B.M: 13.35m  Depth: 9.10m Draught: 6.15m D.W.T: 5200 19.12.2010 Grona Shipping GmbH, Germany. EMS LAKE  IMO 9552032 928/03  MPC Vessel L.O: […]

Landing Craft

Type of Ship: Landing Craft Customer: Al Rashid Shipping Ltd, FZE, UAE Units: 01 AJMAN TRANS LCT  IMO 9818814WMShL-147 (Landing Craft) L.O: 65.48m B.M: 14.20m  Depth: 4.25m Draught: 3.00m D.W.T: 1500     31.10.2017       Al Rashid Shipping Ltd, FZE, UAE

Catamaran Passenger Ferry

Type of Ship: Catamaran Passenger Ferry Customer: TEMESA, DAR ES SALAAM, TANZANIA Units: 01 M V DAR ES SALAAM  BAGAMOYO,            WMShL-124  Catamaran Passenger Ferry L.O: 37.50m B.M: 11.50m  Depth: 3.80m Draught: 1.70m 22.09.2014 TEMESA  (Tanzania Electrical Mechanical and Electronics Service Agency)  DAR ES SALAAM, TANZANIA.

Cargo Carrying Passenger Ship (NPS)

Type of Ship: Cargo Carrying Passenger Ship (NPS) Customer: NEW ZEALAND Units: 01 MV MATALIKI  IMO 9724934 WMShL-130   Cargo Carrying Passenger Ship (NPS) L.O: 44.32m B.M: 9.90m  Depth: 4.10m Draught: 2.60m D.W.T: 175 14.12.2015 NEW ZEALAND  MINISTRY OF FOREIGN  AFFAIRS AND TRADE

6500 DWT Oil Tanker

Type of Ship: Oil Tanker Owners: Al Rashid Shipping Ltd-FZE, UAE Units: 1 Facts: Length Overall: 109.65 m Length (B.P): 105.00 m Breadth Moulded: 18.00 m Depth Moulded: 8.40 m Design Draft: 5.70 TEUS Complement: 18 Persons Main Engine: 3030Kw at 750RPM Trial Speed: 12 Knots Cargo Oil: 6100T @ 0.83Specific Gravity Carriage: Diesel Oil

Western Marine Shipyard received another shipbuilding work-order from UAE

The leading Shipbuilder of Bangladesh Western Marine Shipyard Ltd to build another ship for Al-Rashid Shipping Ltd of UAE. Mr. Sakhawat Hossain Managing of Western Marine & Mr. Ahmed Al Marzuki of AL Rashid Shipping signed the contract for building on Anchor Handling Tugboat (AHTS) on behalf of their respective organizations on 04 Oct 2018. […]

Report 31st March 2016

[gview file=”https://www.wms.com.bd/wp-content/uploads/2017/12/Unaudited-Report-31st-March-2016.pdf”]

Report 31st December 2016

[gview file=”https://www.wms.com.bd/wp-content/uploads/2017/12/Unaudited-Report-31st-December-2016.pdf”]